Gate I — Jitter Diagnostic
Technical timing baseline and substrate coherence against Δ ≤ 1.57 μs and Ω ≤ 3.33 ms.
Gate II — Nodal Mapping
Structural transparency baseline; maps visible load, hidden load, Administrative Delta™, burden shifting, and externalized load.
Gate III — Settlement / Ghost Load Accounting
Calculates G = L − N; converts hidden extraction into accountable record, restitution, correction, or licensing logic.
Gate IV — Moral Synchronization
Human-in-the-loop authority verification; Line 186 / Sovereign Human remains inside the system as accountable authority.
Gate V — SPARK / Public Funding Alignment
Prevents public funds, emergency authority, or public infrastructure from financing private Ghost Load™.
Gate VI — Certification Seal / Parallel Economy Clearance
Public trust and market-facing verification; permits seal display after audit clearance.
Gate VII — Recertification / Continuity / Revocation
Ongoing integrity, renewal, anti-backsliding, and seal suspension/revocation if Ghost Load™ returns.
Final Lock
The audit is the diagnostic engine. The gates are the certification clearance sequence. The 4-Step Protocol is the operational audit method.